Inside Edmonds Community Centre during construction
A couple of years ago, The City of Burnaby, during a time of revitalization, decided to upgrade the Community Centre situation in Edmonds Town Centre.
Edmonds was a neighborhood with no public swimming pool and had been in the midst of revitalization for some time. The City of Burnaby decided to build an 85, 000 square foot Centre, featuring a leisure pool, 6-lane lap pool,聽聽 lounges, two gyms and an indoor playground. With the emergence of the, it not only has a public pool for the first time in the community鈥檚 existence, but indeed one of the nicest.
However with a project of this nature, the lasting life of the structure built must be taken into account 鈥 the longer the life, the better the investment, the more sustainable the project. Thus, a durable concrete waterproofing method was needed, which is where 蜜桃社区鈥檚 was used, as well as our and
With the continuing heat experienced so far this summer, it鈥檚 a good thing the Community Centre took the time to waterproof the concrete properly, ensuring a safe-haven for those trying to beat the heat.
One of the cracks repaired by our Krystol Crack Repair system
To read more on the Aquatic and Community Centre, click .
